You don't have javascript enabled. Good luck with that.
Pencarian
Atasi Genangan, Sudin SDA Jakbar Kerahkan 263 Pompa

263 Pumps Prepared to Handle Inundation in West Jakarta

West Jakarta Water Resources (SDA) Sub-agency has prepared 263 pumps to overcome inundation in this rainy season.

With readiness of personnel and equipment, hopefully inundation can be handled as soon as possible

West Jakarta SDA Sub-agency Head, Purwanti stated, her side prepared 263 pumps, consisting of 138 stationer pumps, 57 mobile pumps, 22 floating pumps, and 46 pump house in 8 sub-districts.

"All pumps are ready to operate to overcome inundation,"she said, Thursday (11/25).

Jakarta Prepares Personnel and Equipment for Floods

Moreover, her side also prepared 1,503 personnel, consisting of 556 pump operators, 906 task force personnel, 32 truck drivers, 9 heavy equipment operators, 3 combi jetting operators, and 1 crane car.

"With readiness of personnel and equipment, hopefully inundation can be handled as soon as possible," she asserted.

According to her, several areas prone to inundation in West Jakarta are located in Rawabuaya, Duri Kosambi, near Semongol River (Tegal Alur) Jalan Patra (Kebon Jeruk), Green Garden, Tubagus Angke.

Linked News
Popular News indeks
  1. Jakarta Taps MSMEs and Creative Economy to Secure Global Top 50 Spot

    access_time11-07-2026 remove_red_eye1633 personAldi Geri Lumban Tobing
  2. Ciliwung River Normalization Accelerated, Pramono Ensures Land Acquisition Without Intermediaries

    access_time10-07-2026 remove_red_eye1459 personDessy Suciati
  3. Blocked Drain on Jalan Palmerah Utara is Being Repaired

    access_time10-07-2026 remove_red_eye1323 personFolmer
  4. Pramono will Take Firm Action Against Individuals Involved in Extortion

    access_time13-07-2026 remove_red_eye1097 personDessy Suciati
  5. Pramono Inaugurates Mayapada Hospital to Improve Healthcare Services

    access_time09-07-2026 remove_red_eye982 personDessy Suciati